# When a spreadsheet stops working for bakery orders

> Signs a bakery order spreadsheet has stopped working, a column layout to use until you switch, and the order to move your records across.

A spreadsheet works for cake orders until about the point where two people
touch it or a week holds more orders than you can remember. The usual tipping
point is the first double-booked Saturday or the first balance you find out
was never paid. When that happens, move your pantry, customers and open
orders into order software, in that order, keep the old sheet as a read-only
archive, and build your products once rather than importing them.

## The signs the sheet has stopped working

Most bakers switch after one of these, not before:

- **A double-booked date.** The sheet holds orders, not capacity. Nothing in it
  stops a third wedding cake landing on a Saturday you can only do two on.
- **A balance nobody chased.** The deposit column says paid, the balance column
  is blank, and the event was last week. A sheet records payments; it does not
  remind anyone.
- **Prices built from last year's costs.** Your costing tab used butter at last
  spring's price. Every quote since has been built on it, and the sheet gives
  no sign that anything moved.
- **Allergens retyped on every order.** The recipe changed in March; the
  allergen note on the order template did not.
- **Orders arriving in four places.** Instagram, email, a web form and a phone
  call, all copied into the sheet by hand, some of them twice.
- **A second person.** The moment someone else edits the sheet, you start
  finding rows changed with no record of who changed them or when.

If two or more of these happen every week, the sheet is costing you more than a
switch would.

## A cake order sheet layout to use until you switch

If you are not ready to move yet, set the sheet up so the move is easy later.
One row per order line (not one row per order), with the order number repeated
on every line of the same order:

| Column | Example | Why it matters |
| --- | --- | --- |
| order_number | 1042 | Groups lines into one order |
| order_date | 2026-09-14 | When the order was taken |
| event_date | 2026-10-18 | The date that drives everything else |
| fulfilment | delivery | Pickup or delivery |
| customer_first_name | Priya | |
| customer_last_name | Shah | |
| customer_email | priya@example.com | The one field that reliably identifies a customer |
| customer_phone | 0400 000 000 | |
| item | 2-tier fondant cake | One line per item |
| quantity | 1 | |
| unit_price | 340.00 | In dollars or pounds, not cents |
| allergens_notes | no nuts, guest is coeliac | Copied from the customer, in their words |
| deposit_paid | 170.00 | |
| deposit_date | 2026-09-14 | |
| balance_due_date | 2026-10-08 | Set from the event date, not the order date |
| balance_paid | | Blank until it lands |
| delivery_address | 12 Harbour St | |
| notes | topper ordered in | |

Three rules keep it clean: one date format in every date column (YYYY-MM-DD
avoids the day-month mix-up), one email per customer and no merged cells.

## What to move, and in what order

The order that works is **pantry, customers, open orders, expenses**, then
build your products.

1. **Pantry items.** Ingredients and packaging, with what you paid and the
   pack size. Everything else is costed from these.
2. **Customers.** Name, email and phone at minimum. This is the list your
   marketing and repeat orders run from.
3. **Open orders first, history second.** Everything with an event date in
   the future needs to be in the new system before you stop using the sheet.
   Past orders are worth bringing in for the customer history, but they can
   follow a week later.
4. **Expenses.** The last twelve months, so your profit figures start with a
   real baseline.
5. **Products, built by hand.** A product made from recipes, components and
   packaging is something you set up once in the product builder, not a row you
   import. It is usually an afternoon for a core menu, and it is the step that
   makes every future price come from real costs.

Run both for one week. New orders go in the new system only; the sheet stays
open read-only for lookups. After a week you will have stopped opening it.

## How long does it take to move off a spreadsheet?

For a typical home or small bakery, a weekend: an evening tidying the sheet,
an evening importing, a day building the core products. The tidying is where
the time goes, and the causes are predictable: two date formats in one column,
one row per order instead of one per line, customers with no email and totals
that disagree with their own lines because a delivery fee went missing. Fix
those in the spreadsheet with find-and-replace before you import, not row by
row afterwards.

## Moving into ibakepro

ibakepro imports orders, customers, expenses and pantry items from CSV, matches your
column names for you, shows every problem row grouped by cause before anything
is saved, and leaves automated messages off for imported records unless you
switch them on, so nobody gets a payment reminder for a cake they ate in March.
Once the pantry is in and the products are built,
[the cake pricing calculator](/blog/cake-pricing-calculator) is the arithmetic
every price is then built on. For moving from other software rather than a
sheet, see [how to switch bakery software](/answers/how-do-i-switch-bakery-software).
